Development of Regions In January-November 2019: Inertia Retains

N. Zubarevich
{"title":"Development of Regions In January-November 2019: Inertia Retains","authors":"N. Zubarevich","doi":"10.2139/ssrn.3554973","DOIUrl":null,"url":null,"abstract":"The regions over January-November 2019 demonstrated stunted social and economic development. Except renewal in the residential construction sector following the recession the fastest rate of development was posted in the largest Moscow agglomeration. Amid the weak wage growth seen in the vast majority of the regions the low level of unemployment retains. The budgetary situation is favorable, however the revenues growth of the budgets of many regions in large measure is secured by the growth of transfers. The need to implement President’s Executive Orders was reflected in the outstripping growth of budgetary expenditure on national economy and provision of public amenities.","PeriodicalId":137820,"journal":{"name":"Political Economy: National","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Political Economy: National","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3554973","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The regions over January-November 2019 demonstrated stunted social and economic development. Except renewal in the residential construction sector following the recession the fastest rate of development was posted in the largest Moscow agglomeration. Amid the weak wage growth seen in the vast majority of the regions the low level of unemployment retains. The budgetary situation is favorable, however the revenues growth of the budgets of many regions in large measure is secured by the growth of transfers. The need to implement President’s Executive Orders was reflected in the outstripping growth of budgetary expenditure on national economy and provision of public amenities.
2019年1 - 11月地区发展:惯性依然存在
2019年1月至11月,这些地区的社会和经济发展受到阻碍。除了经济衰退后住宅建筑行业的更新,发展速度最快的是莫斯科最大的城市群。在绝大多数地区工资增长乏力的情况下,低失业率依然存在。预算情况是有利的,但是,许多区域预算的收入增长在很大程度上是由转移的增长保证的。执行总统行政命令的必要性反映在国民经济和提供公共设施的预算支出增长过快。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信