The design and implementation of the operator console workstations at the Central Artery/Third Harbor Tunnel project's operations control center

C. T. Marcus, R. Stack
{"title":"The design and implementation of the operator console workstations at the Central Artery/Third Harbor Tunnel project's operations control center","authors":"C. T. Marcus, R. Stack","doi":"10.1109/VNIS.1995.518828","DOIUrl":null,"url":null,"abstract":"This paper presents how task analysis, standard operating procedures, and interface prototyping have been used in the design and implementation of the Operator Console Workstations at the Central Artery/Third Harbor Tunnel project's operations control center. Each of these three elements has played a key role in ensuring that the final operator interface to a complex control system is one which is robust, user-friendly, and minimizes the risk of operator error.","PeriodicalId":337008,"journal":{"name":"Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future","volume":"184 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VNIS.1995.518828","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents how task analysis, standard operating procedures, and interface prototyping have been used in the design and implementation of the Operator Console Workstations at the Central Artery/Third Harbor Tunnel project's operations control center. Each of these three elements has played a key role in ensuring that the final operator interface to a complex control system is one which is robust, user-friendly, and minimizes the risk of operator error.
中环大动脉/第三海底隧道工程营运控制中心的操作员控制台工作站的设计及实施
本文介绍了任务分析、标准操作程序和界面原型如何用于中央大动脉/第三海港隧道工程的操作控制中心的操作员控制台工作站的设计和实施。这三个要素中的每一个都在确保复杂控制系统的最终操作界面具有鲁棒性、用户友好性和最小化操作错误风险方面发挥了关键作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信