{"title":"The Adjudicator’s Decision","authors":"The Rt Hon. Lord Justice Coulson","doi":"10.1093/oso/9780198822110.003.0026","DOIUrl":null,"url":null,"abstract":"Reasons\n It is often forgotten that, under the Scheme for Construction Contracts, the adjudicator is not required to give reasons unless at least one of the parties requires them. Thus it is necessary for one or both of the parties to notify the...","PeriodicalId":434490,"journal":{"name":"Coulson on Construction Adjudication","volume":"309 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Coulson on Construction Adjudication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/oso/9780198822110.003.0026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Reasons
It is often forgotten that, under the Scheme for Construction Contracts, the adjudicator is not required to give reasons unless at least one of the parties requires them. Thus it is necessary for one or both of the parties to notify the...