{"title":"A comparison of the static task graph scheduling algorithms","authors":"J. Brest, V. Zumer","doi":"10.1109/ITI.2001.937995","DOIUrl":null,"url":null,"abstract":"In this paper the new algorithm for static task graph scheduling on multiprocessor systems is proposed and a comparison with two algorithms known from the literature is presented. The comparison of the algorithms is made in terms of the completion times of resulting schedules using a prototype standard task graph set.","PeriodicalId":375405,"journal":{"name":"Proceedings of the 23rd International Conference on Information Technology Interfaces, 2001. ITI 2001.","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 23rd International Conference on Information Technology Interfaces, 2001. ITI 2001.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITI.2001.937995","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
In this paper the new algorithm for static task graph scheduling on multiprocessor systems is proposed and a comparison with two algorithms known from the literature is presented. The comparison of the algorithms is made in terms of the completion times of resulting schedules using a prototype standard task graph set.