Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari

Al Mustahyun, S. Sunaryo, La Ode Musa Rahmat, Sufrianto Sufrianto
{"title":"Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari","authors":"Al Mustahyun, S. Sunaryo, La Ode Musa Rahmat, Sufrianto Sufrianto","doi":"10.54297/sciej.v2i1.166","DOIUrl":null,"url":null,"abstract":"Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increasedproductivity will reduce work time, and will reduce costs, especiallylabor costs so that the minimum labor cost is obtained (labor costs)to get competitive prices both for auction and implementation. Thepurpose of this study is to analyze the labor productivity time incompleting 1 m2 of masonry bricks and to analyze the productivityvalue of brick masons in completing work activities in the constructionproject of the Mandala Wangi 2 female dormitory. The results showedthat the time required to complete 1 m2 of brick laying work was 41.13minutes on average. The productivity of the artisans working on the 1stfloor is an average of 1.45 m2/hr. Meanwhile, the productivity ofcraftsmen working on the 2nd floor is an average of 1.47 m2/hr.","PeriodicalId":275633,"journal":{"name":"Sultra Civil Engineering Journal","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sultra Civil Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54297/sciej.v2i1.166","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increasedproductivity will reduce work time, and will reduce costs, especiallylabor costs so that the minimum labor cost is obtained (labor costs)to get competitive prices both for auction and implementation. Thepurpose of this study is to analyze the labor productivity time incompleting 1 m2 of masonry bricks and to analyze the productivityvalue of brick masons in completing work activities in the constructionproject of the Mandala Wangi 2 female dormitory. The results showedthat the time required to complete 1 m2 of brick laying work was 41.13minutes on average. The productivity of the artisans working on the 1stfloor is an average of 1.45 m2/hr. Meanwhile, the productivity ofcraftsmen working on the 2nd floor is an average of 1.47 m2/hr.
砖匠生产力分析了肯达里市曼荼罗公主2号宿舍项目
生产力是影响建筑业绩效能力的基本因素之一。生产率的提高将减少工作时间,并将降低成本,特别是人工成本,从而获得最低的人工成本(人工成本),以获得拍卖和实施的有竞争力的价格。本研究的目的是分析在曼荼罗旺吉2号女宿舍建设工程中,完成1平方米砌砖的劳动生产率时间,并分析砌砖工在完成工作活动中的生产率价值。结果表明,完成1 m2砌砖工作所需时间平均为41.13分钟。在一楼工作的工匠的生产率平均为1.45平方米/小时。同时,在二楼工作的工匠的生产率平均为1.47平方米/小时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信