Computation of Cutting Lengths of Guys

S. J. Jarecki, Y. C. Lee, P. Christiano
{"title":"Computation of Cutting Lengths of Guys","authors":"S. J. Jarecki, Y. C. Lee, P. Christiano","doi":"10.1061/JPWEAM.0000686","DOIUrl":null,"url":null,"abstract":"A method is presented for computing the cutting lengths of cable segments used as guys for antennas and transmission towers. The analysis takes into account both concentrated and distributed loading. An iterative computation procedure is employed whereby the length of the bottom cable segment and the angle of inclination of the anchor tension are initially assumed. The equations of equilibrium and compatibility are applied to each element of the assembly in a recurrent manner. The procedure is terminated when the coordinates of the uppermost joint of the guy are within a prescribed tolerance to those of the tower pin. A typical example is presented.","PeriodicalId":136288,"journal":{"name":"Journal of the Power Division","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1971-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Power Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JPWEAM.0000686","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A method is presented for computing the cutting lengths of cable segments used as guys for antennas and transmission towers. The analysis takes into account both concentrated and distributed loading. An iterative computation procedure is employed whereby the length of the bottom cable segment and the angle of inclination of the anchor tension are initially assumed. The equations of equilibrium and compatibility are applied to each element of the assembly in a recurrent manner. The procedure is terminated when the coordinates of the uppermost joint of the guy are within a prescribed tolerance to those of the tower pin. A typical example is presented.
计算切割长度的家伙
提出了一种计算天线和发射塔线段切割长度的方法。分析同时考虑了集中荷载和分布荷载。采用迭代计算的方法,初步假设底索段长度和锚索张力倾斜角。平衡和相容性方程以循环的方式应用于装配的每个元件。当杆的最上关节的坐标与塔销的坐标在规定的公差范围内时,程序终止。给出了一个典型的例子。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信