REDUCTION OF ECONOMIC RISK BY RE-PLANNING IN REAL-TIME

S. Lobov
{"title":"REDUCTION OF ECONOMIC RISK BY RE-PLANNING IN REAL-TIME","authors":"S. Lobov","doi":"10.15550/ASJ.2015.01.114","DOIUrl":null,"url":null,"abstract":"Risks in procurement of material resources and production at Ore Mining and Processing Enterprises (OMPE) are considered. It is established that economic risks can be reduced by replanning in realtime. Methodological approaches to determining the economic effect of automated information systems (AIS) from replanning of procurement taking into aprobability of nondelivery are proposed. Se t losses from risks of accidents and unplanned outages of machinery and equipment, risks of not identifying the performance of machines and equipment, risks of not identifying quality raw material, risks of fluctuations in the volume of production at previous stages, risks of unplanned urgent orders, etc. Management solutions to reduce these risks are developed. It is proved that in terms of capacity constraints any delay replan ning and determining backup machines and equipment leads to losses from the reduction in production volumes in subsequent stages.","PeriodicalId":403624,"journal":{"name":"The Advanced Science Journal","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Advanced Science Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15550/ASJ.2015.01.114","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Risks in procurement of material resources and production at Ore Mining and Processing Enterprises (OMPE) are considered. It is established that economic risks can be reduced by replanning in realtime. Methodological approaches to determining the economic effect of automated information systems (AIS) from replanning of procurement taking into aprobability of nondelivery are proposed. Se t losses from risks of accidents and unplanned outages of machinery and equipment, risks of not identifying the performance of machines and equipment, risks of not identifying quality raw material, risks of fluctuations in the volume of production at previous stages, risks of unplanned urgent orders, etc. Management solutions to reduce these risks are developed. It is proved that in terms of capacity constraints any delay replan ning and determining backup machines and equipment leads to losses from the reduction in production volumes in subsequent stages.
通过实时重新规划减少经济风险
考虑了矿石开采和加工企业(OMPE)在材料资源采购和生产中的风险。通过实时重新规划,可以降低经济风险。提出了从考虑不交付概率的采购重新规划中确定自动化信息系统(AIS)的经济影响的方法方法。排除机械设备意外停机风险、机器设备性能不确定风险、原材料质量不确定风险、前一阶段产量波动风险、计划外紧急订单风险等造成的损失。。开发了减少这些风险的管理解决方案。证明了在产能约束条件下,任何延迟重新规划和确定备用机器和设备都会导致后续阶段产量减少的损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信