{"title":"Research on operation scheme and capacity of airport runway under non-stop construction","authors":"Q. Ye, Ping Xue, Xiaobo Zhu, Lei Guo, Junwei Hao","doi":"10.1117/12.2652460","DOIUrl":null,"url":null,"abstract":"In recent years, the civil aviation industry developed rapidly. Many airports have faced reconstruction and expansion. Non-stop construction has a negative impact on the operating efficiency and capacity. A case study of the target 4F airport is carried out to analyze the operation scheme of runway closure under the condition of non-stop construction. Analyze the impact of runway closure on the airport according to the change of airport traffic volume, runway and taxiway operation efficiency and other factors. It has guiding significance for the project. Provide reference for the airport construction and provide reference basis for the subsequent reasonable arrangement of construction sequence.","PeriodicalId":116712,"journal":{"name":"Frontiers of Traffic and Transportation Engineering","volume":"1154 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontiers of Traffic and Transportation Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2652460","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In recent years, the civil aviation industry developed rapidly. Many airports have faced reconstruction and expansion. Non-stop construction has a negative impact on the operating efficiency and capacity. A case study of the target 4F airport is carried out to analyze the operation scheme of runway closure under the condition of non-stop construction. Analyze the impact of runway closure on the airport according to the change of airport traffic volume, runway and taxiway operation efficiency and other factors. It has guiding significance for the project. Provide reference for the airport construction and provide reference basis for the subsequent reasonable arrangement of construction sequence.