Analysis Reliability of Distribution Network Interconnected with Distributed Generation

Y. Siregar, Z. Pane, Rizky Kurniawan
{"title":"Analysis Reliability of Distribution Network Interconnected with Distributed Generation","authors":"Y. Siregar, Z. Pane, Rizky Kurniawan","doi":"10.1109/ic2ie53219.2021.9649236","DOIUrl":null,"url":null,"abstract":"The distribution network is the part of the electric power system located closest to the customer and has the highest operating failure rate. Distributed Generation (DG) with an interconnected distribution network impacts the distribution network's reliability level. This research analyzes the distribution network's reliability interconnected with the Distributed generation before and after DG interconnection using the section technique method. The results showed a change in blackout time of 40.67% after the PM.6 Photo feeder was connected to DG with a fixed blackout frequency.","PeriodicalId":178443,"journal":{"name":"2021 4th International Conference of Computer and Informatics Engineering (IC2IE)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Conference of Computer and Informatics Engineering (IC2IE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ic2ie53219.2021.9649236","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The distribution network is the part of the electric power system located closest to the customer and has the highest operating failure rate. Distributed Generation (DG) with an interconnected distribution network impacts the distribution network's reliability level. This research analyzes the distribution network's reliability interconnected with the Distributed generation before and after DG interconnection using the section technique method. The results showed a change in blackout time of 40.67% after the PM.6 Photo feeder was connected to DG with a fixed blackout frequency.
分布式发电互联配电网可靠性分析
配电网是电力系统中离用户最近且运行故障率最高的部分。分布式发电在配电网中的应用影响着配电网的可靠性水平。本文采用分段技术方法对DG并网前后配电网与分布式发电并网的可靠性进行了分析。结果表明,PM.6光馈线以固定的停电频率连接DG后,停电时间变化40.67%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信