R. Wynands, A. Bauch, D. Griebsch, R. Schroder, S. Weyers
{"title":"The new PTB caesium fountain clock CSF2","authors":"R. Wynands, A. Bauch, D. Griebsch, R. Schroder, S. Weyers","doi":"10.1109/FREQ.2005.1573942","DOIUrl":null,"url":null,"abstract":"At PTB, a second caesium fountain clock, CSF2, is in the process of being set up. It differs from the first PTB caesium fountain standard CSF1 in a number of details, which are consecutively specified. First cold atoms have been prepared in the new apparatus","PeriodicalId":108334,"journal":{"name":"Proceedings of the 2005 IEEE International Frequency Control Symposium and Exposition, 2005.","volume":"448 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2005 IEEE International Frequency Control Symposium and Exposition, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FREQ.2005.1573942","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
At PTB, a second caesium fountain clock, CSF2, is in the process of being set up. It differs from the first PTB caesium fountain standard CSF1 in a number of details, which are consecutively specified. First cold atoms have been prepared in the new apparatus