The system measures for short circuit current limitation in megalopolis at the example of Moscow-city power system

S. Utts, Y. Kucherov
{"title":"The system measures for short circuit current limitation in megalopolis at the example of Moscow-city power system","authors":"S. Utts, Y. Kucherov","doi":"10.1109/ENERGYCON.2014.6850444","DOIUrl":null,"url":null,"abstract":"The consumption increase, generating capacities and electric grid development in Moscow region and especially on Moscow-City territory in short-term and long-term perspective will lead to the short circuit current increase to ultrahigh values which exceed the disconnection capability of the serial equipment. The present article covers the issues of short circuit current limitation in megalopolis power system taking Moscow Power System as an example. The issues of consumers' power supply reliability were considered. The foreign experience of short circuit current limitation in megalopolis was analyzed. The system approach for solving this problem was proposed. The future recommendations for energy companies were developed.","PeriodicalId":410611,"journal":{"name":"2014 IEEE International Energy Conference (ENERGYCON)","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Energy Conference (ENERGYCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYCON.2014.6850444","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The consumption increase, generating capacities and electric grid development in Moscow region and especially on Moscow-City territory in short-term and long-term perspective will lead to the short circuit current increase to ultrahigh values which exceed the disconnection capability of the serial equipment. The present article covers the issues of short circuit current limitation in megalopolis power system taking Moscow Power System as an example. The issues of consumers' power supply reliability were considered. The foreign experience of short circuit current limitation in megalopolis was analyzed. The system approach for solving this problem was proposed. The future recommendations for energy companies were developed.
以莫斯科市电系统为例,提出了特大城市短路限流的系统措施
从短期和长期来看,莫斯科地区特别是莫斯科-城市地区的用电量增加、发电量增加和电网发展将导致短路电流增加到超高值,超过串联设备的断开能力。本文以莫斯科电力系统为例,讨论了特大城市电力系统的短路限流问题。考虑了用户供电可靠性问题。分析了国外特大城市短路限流的经验。提出了解决这一问题的系统方法。对能源公司提出了未来的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信