Theory and Application Exploration of Building Life Cycle Management Based on BIM Technology : Take the Student and Teacher Activity Center of Chengdu University of Technology as an example
{"title":"Theory and Application Exploration of Building Life Cycle Management Based on BIM Technology : Take the Student and Teacher Activity Center of Chengdu University of Technology as an example","authors":"Wu Zhihao, Wang Jinchuan","doi":"10.1109/EPCE58798.2023.00046","DOIUrl":null,"url":null,"abstract":"To address issues such as repeated changes in construction project drawings, communication barriers between various parties, and low modeling efficiency, this article takes the Student and Teacher Activity Center of Chengdu University of Technology as an example to explore the theoretical route and specific implementation content of building information modeling in the forward design, construction, operation, and maintenance stages. In the forward design phase, the optimization of the architectural model is realized based on the reusability of the BIM model, and the construction drawings are drawn. During the construction phase, a series of Glodon software is used for engineering project management. During the operation and maintenance phase, build a BIM operation and maintenance platform to provide efficient services to the owners. In the management of the entire lifecycle of buildings, Dynamo programming software is integrated for targeted secondary development of different stages of Revit to achieve modeling efficiency and visualization.","PeriodicalId":355442,"journal":{"name":"2023 2nd Asia Conference on Electrical, Power and Computer Engineering (EPCE)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 2nd Asia Conference on Electrical, Power and Computer Engineering (EPCE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPCE58798.2023.00046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
To address issues such as repeated changes in construction project drawings, communication barriers between various parties, and low modeling efficiency, this article takes the Student and Teacher Activity Center of Chengdu University of Technology as an example to explore the theoretical route and specific implementation content of building information modeling in the forward design, construction, operation, and maintenance stages. In the forward design phase, the optimization of the architectural model is realized based on the reusability of the BIM model, and the construction drawings are drawn. During the construction phase, a series of Glodon software is used for engineering project management. During the operation and maintenance phase, build a BIM operation and maintenance platform to provide efficient services to the owners. In the management of the entire lifecycle of buildings, Dynamo programming software is integrated for targeted secondary development of different stages of Revit to achieve modeling efficiency and visualization.