{"title":"Modeling and Simulation of an Electricity Distribution System - Case Study: Compañía de Luz y Fuerza S.A","authors":"E. Piris, D. Aquino, Walter Furler, E. Paredes","doi":"10.1109/CONCAPANXXXIX47272.2019.8976973","DOIUrl":null,"url":null,"abstract":"Due to the constant growth of the demand for electric energy that is continuously recorded in the distribution networks, and the operational problems that this entails, the companies responsible for supplying energy must have appropriate analysis techniques to efficiently solve this problem. This suggests that it is necessary to implement modern technologies in the management of distribution systems capable of providing alternatives for decision making in a fast and economically viable manner supported by periodic studies with technical and economic bases. This work summarizes the first stage of the implementation of ETAP 18.1.0 Electrical Power System Analysis, software used for the study of the Villarrica distribution network carried out by the Compañía de Luz y Fuerza S.A. (CLYFSA), company in charge of the supply of electrical energy in the city of Villarrica since 1953 and currently has more than 14.000 users. The software is used for the modeling of the entire medium voltage electrical distribution system (including public and exclusive transformers, capacitor bank, pre-assembled and protected distribution lines, etc.) and then perform simulations for different operating states of the system and loading conditions These simulations in turn are used to evaluate the decision making of alternatives that improve the reliability and robustness of the electrical system in such a way to improve the quality of service.","PeriodicalId":272652,"journal":{"name":"2019 IEEE 39th Central America and Panama Convention (CONCAPAN XXXIX)","volume":"17 8","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 39th Central America and Panama Convention (CONCAPAN XXXIX)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CONCAPANXXXIX47272.2019.8976973","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Due to the constant growth of the demand for electric energy that is continuously recorded in the distribution networks, and the operational problems that this entails, the companies responsible for supplying energy must have appropriate analysis techniques to efficiently solve this problem. This suggests that it is necessary to implement modern technologies in the management of distribution systems capable of providing alternatives for decision making in a fast and economically viable manner supported by periodic studies with technical and economic bases. This work summarizes the first stage of the implementation of ETAP 18.1.0 Electrical Power System Analysis, software used for the study of the Villarrica distribution network carried out by the Compañía de Luz y Fuerza S.A. (CLYFSA), company in charge of the supply of electrical energy in the city of Villarrica since 1953 and currently has more than 14.000 users. The software is used for the modeling of the entire medium voltage electrical distribution system (including public and exclusive transformers, capacitor bank, pre-assembled and protected distribution lines, etc.) and then perform simulations for different operating states of the system and loading conditions These simulations in turn are used to evaluate the decision making of alternatives that improve the reliability and robustness of the electrical system in such a way to improve the quality of service.
由于不断记录在配电网络中的电能需求的不断增长,以及由此带来的操作问题,负责供应能源的公司必须具有适当的分析技术来有效地解决这一问题。这表明必须在分配系统的管理中采用现代技术,这些技术能够在具有技术和经济基础的定期研究的支持下,以快速和经济上可行的方式为决策提供备选办法。这项工作总结了ETAP 18.1.0电力系统分析的第一阶段实施,该软件用于研究维拉里卡配电网,该软件由Compañía de Luz y Fuerza S.A. (CLYFSA)公司执行,该公司自1953年以来负责维拉里卡市的电力供应,目前拥有超过14,000名用户。该软件用于整个中压配电系统的建模(包括公共和专用变压器,电容器组,预组装和保护配电线路,等),然后对系统的不同运行状态和负载条件进行模拟,这些模拟反过来用于评估备选方案的决策,以提高电气系统的可靠性和鲁棒性,从而提高服务质量。