{"title":"System Reliability Risk Model and Its Application to Station Breaker Replacement","authors":"Dange Huang, B. Bagen","doi":"10.1109/PMAPS47429.2020.9183702","DOIUrl":null,"url":null,"abstract":"Utilities are facing many challenges in planning and operating the power systems. The use of probabilistic planning approach is a beneficial supplement to the existing system planning and operation process. A series of tools has been developed in Manitoba Hydro to provide inputs to high level decision making process including capital project justification, enhancement of transmission asset management, prioritization of transmission asset investment. The applications of the basic concept that has been used in the risk assessment tools are illustrated through the assessment of a potential investment project involving the replacement of a number of breakers in a practical power system. Particularly the evaluation of the breaker replacement project considers the operational constraints, which is an important aspect that needs to be modelled in practical power system reliability assessment.","PeriodicalId":126918,"journal":{"name":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS47429.2020.9183702","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Utilities are facing many challenges in planning and operating the power systems. The use of probabilistic planning approach is a beneficial supplement to the existing system planning and operation process. A series of tools has been developed in Manitoba Hydro to provide inputs to high level decision making process including capital project justification, enhancement of transmission asset management, prioritization of transmission asset investment. The applications of the basic concept that has been used in the risk assessment tools are illustrated through the assessment of a potential investment project involving the replacement of a number of breakers in a practical power system. Particularly the evaluation of the breaker replacement project considers the operational constraints, which is an important aspect that needs to be modelled in practical power system reliability assessment.
系统可靠性风险模型及其在车站断路器更换中的应用
电力公司在规划和运行电力系统方面面临着许多挑战。采用概率规划方法是对现有系统规划和运行过程的有益补充。曼尼托巴水电公司开发了一系列工具,为高层决策过程提供投入,包括资本项目论证、加强输电资产管理、输电资产投资的优先次序。通过对一个潜在投资项目的评估来说明风险评估工具中所使用的基本概念的应用,该项目涉及在实际电力系统中更换一些断路器。特别是断路器更换方案的评估要考虑运行约束,这是实际电力系统可靠性评估中需要建模的一个重要方面。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信