{"title":"Analyzing the Impact of Challenges in Prefabricated Building Construction Supply Chains","authors":"Rishabh Rastogi, S. Solanki, V. K. Paul","doi":"10.55708/js0105008","DOIUrl":null,"url":null,"abstract":": Across various barriers pertaining to prefabricated building construction projects, a major barrier identified by the literature was integration of various components of prefabricated building project supply chain network, including the material and human resource supply chains. The literature suggests a need of exploring this barrier of supply chain integration into its various sub factors/challenges (termed as supply chain challenges) with the perspective of prefabricated building construction supply chains. This research tries to fill this gap by analyzing three cases of existing prefabricated building construction supply chains in Indian context with different configurations, geophysical profiles and project typologies. This study gives an understanding of the relationship among supply chain challenges, the variation in their relative impact on project time and cost (within the supply chain and across the different configurations of supply chains), and the underlying causes of these variations.","PeriodicalId":156864,"journal":{"name":"Journal of Engineering Research and Sciences","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Research and Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55708/js0105008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
: Across various barriers pertaining to prefabricated building construction projects, a major barrier identified by the literature was integration of various components of prefabricated building project supply chain network, including the material and human resource supply chains. The literature suggests a need of exploring this barrier of supply chain integration into its various sub factors/challenges (termed as supply chain challenges) with the perspective of prefabricated building construction supply chains. This research tries to fill this gap by analyzing three cases of existing prefabricated building construction supply chains in Indian context with different configurations, geophysical profiles and project typologies. This study gives an understanding of the relationship among supply chain challenges, the variation in their relative impact on project time and cost (within the supply chain and across the different configurations of supply chains), and the underlying causes of these variations.