Estimating the costs of a reengineering project

H. Sneed
{"title":"Estimating the costs of a reengineering project","authors":"H. Sneed","doi":"10.1109/WCRE.2005.18","DOIUrl":null,"url":null,"abstract":"Accurate estimation of project costs is an essential prerequisite to making a reengineering project. Existing systems are usually reengineered because it is cheaper to reengineer them than to redevelop or to replace them. However, to make this decision, management must know what the reengineering will cost. This contribution describes an eight step tool supported process for calculating the time and the costs required to reengineer an existing system. The process is derived from the author's 20 year experience in estimating reengineering projects and has been validated by several real life field experiments in which it has been refined and calibrated","PeriodicalId":119724,"journal":{"name":"12th Working Conference on Reverse Engineering (WCRE'05)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2005-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"51","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"12th Working Conference on Reverse Engineering (WCRE'05)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WCRE.2005.18","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 51

Abstract

Accurate estimation of project costs is an essential prerequisite to making a reengineering project. Existing systems are usually reengineered because it is cheaper to reengineer them than to redevelop or to replace them. However, to make this decision, management must know what the reengineering will cost. This contribution describes an eight step tool supported process for calculating the time and the costs required to reengineer an existing system. The process is derived from the author's 20 year experience in estimating reengineering projects and has been validated by several real life field experiments in which it has been refined and calibrated
估算再造项目的成本
准确估算项目成本是进行再造项目的必要前提。现有系统通常被重新设计,因为重新设计它们比重新开发或替换它们更便宜。然而,为了做出这个决定,管理层必须知道重组的成本。该贡献描述了计算重新设计现有系统所需的时间和成本的八步工具支持过程。该过程来源于作者20年估算再工程项目的经验,并通过几个实际领域的实验进行了验证,其中对其进行了改进和校准
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信