{"title":"Transmission expansion planning for wind turbine integrated power systems considering contingencies","authors":"F. Ugranli, E. Karatepe","doi":"10.1109/INISTA.2014.6873643","DOIUrl":null,"url":null,"abstract":"Increasing penetration level of wind turbines in power systems reveal new challenges for the power system planners. Transmission expansion planning is one of the most important planning problems to maintain secure and reliable operation of power systems. In this study, a new transmission expansion planning methodology considering N-1 contingency conditions is proposed to find the location of new transmission lines while minimizing investment cost and curtailed wind energy. To deal with the uncertainty of load and output power of wind turbines, fuzzy clustering based probabilistic method is used for determination of load and wind scenarios. Proposed methodology uses the DC-power flow equations based optimal power flow and integer genetic algorithm to determine the locations of new assets and it is applied to the modified IEEE 24-bus test system.","PeriodicalId":339652,"journal":{"name":"2014 IEEE International Symposium on Innovations in Intelligent Systems and Applications (INISTA) Proceedings","volume":"72 10","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Symposium on Innovations in Intelligent Systems and Applications (INISTA) Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INISTA.2014.6873643","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9
Abstract
Increasing penetration level of wind turbines in power systems reveal new challenges for the power system planners. Transmission expansion planning is one of the most important planning problems to maintain secure and reliable operation of power systems. In this study, a new transmission expansion planning methodology considering N-1 contingency conditions is proposed to find the location of new transmission lines while minimizing investment cost and curtailed wind energy. To deal with the uncertainty of load and output power of wind turbines, fuzzy clustering based probabilistic method is used for determination of load and wind scenarios. Proposed methodology uses the DC-power flow equations based optimal power flow and integer genetic algorithm to determine the locations of new assets and it is applied to the modified IEEE 24-bus test system.