Jobsite logistic simulation in mechanized tunneling

M. Scheffer, T. Rahm, R. Duhme, M. Thewes, M. König
{"title":"Jobsite logistic simulation in mechanized tunneling","authors":"M. Scheffer, T. Rahm, R. Duhme, M. Thewes, M. König","doi":"10.1109/WSC.2014.7020032","DOIUrl":null,"url":null,"abstract":"Projects in mechanized tunneling frequently do not reach their targeted production performance. Reasons are often related to an undersized or disturbed supply-chain management of the surface jobsite. Due to the sensitive interaction of production and logistic processes, planning and analyzing the supply-chain is a challenging task. Transparent evaluation of chosen logistic strategies or project setups can be achieved by application of process simulation. This paper presents the continued work of a simulation approach to analyze the complex system of mechanized tunneling. Special focus of this publication lies on the internal logistic as a part of the jobsite supply-chain. The generic implementation allows a flexible configuration of jobsite elements to compare possible setups. A case study demonstrates the approach and highlights the sensitive interaction of production and logistic processes under the influence of disturbances. Additionally, improvements to the original setup of the case study's construction equipment can be derived.","PeriodicalId":446873,"journal":{"name":"Proceedings of the Winter Simulation Conference 2014","volume":"154 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Winter Simulation Conference 2014","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2014.7020032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

Projects in mechanized tunneling frequently do not reach their targeted production performance. Reasons are often related to an undersized or disturbed supply-chain management of the surface jobsite. Due to the sensitive interaction of production and logistic processes, planning and analyzing the supply-chain is a challenging task. Transparent evaluation of chosen logistic strategies or project setups can be achieved by application of process simulation. This paper presents the continued work of a simulation approach to analyze the complex system of mechanized tunneling. Special focus of this publication lies on the internal logistic as a part of the jobsite supply-chain. The generic implementation allows a flexible configuration of jobsite elements to compare possible setups. A case study demonstrates the approach and highlights the sensitive interaction of production and logistic processes under the influence of disturbances. Additionally, improvements to the original setup of the case study's construction equipment can be derived.
机械化隧道施工现场物流仿真
机械化隧道工程经常不能达到目标生产性能。原因通常与地面作业现场的供应链管理规模不足或受到干扰有关。由于生产和物流过程的敏感互动,规划和分析供应链是一项具有挑战性的任务。通过应用过程模拟,可以实现对选定的物流策略或项目设置的透明评估。本文介绍了用仿真方法分析复杂机械掘进系统的后续工作。本出版物的特别重点在于内部物流作为工地供应链的一部分。通用实现允许灵活配置工地元素,以比较可能的设置。一个案例研究演示了该方法,并强调了在干扰影响下生产和物流过程的敏感相互作用。此外,可以对案例研究的施工设备的原始设置进行改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信