{"title":"An electrical reliability metric for preventive maintenance: Mean time between failure plus finds","authors":"John R. Duenckel, R. Soileau, Jerry D. Pittman","doi":"10.1109/PCICON.2015.7435085","DOIUrl":null,"url":null,"abstract":"Electrical reliability can be measured by taking a systematic approach to documenting PM (preventive maintenance) records with a metric derived from its discovery finds. These finds, however minor, are leading indicators to equipment failures. Documenting and reviewing them justifies electrical PM programs, measures PM effectiveness, and optimizes PM intervals.","PeriodicalId":191070,"journal":{"name":"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2015.7435085","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Electrical reliability can be measured by taking a systematic approach to documenting PM (preventive maintenance) records with a metric derived from its discovery finds. These finds, however minor, are leading indicators to equipment failures. Documenting and reviewing them justifies electrical PM programs, measures PM effectiveness, and optimizes PM intervals.