Guang-fa Zhang, Qin-Tao Li, Wei-ying Zhang, Jian Lin
{"title":"Page-Based Estimation Methodology for Software Project","authors":"Guang-fa Zhang, Qin-Tao Li, Wei-ying Zhang, Jian Lin","doi":"10.1109/CISE.2010.5676745","DOIUrl":null,"url":null,"abstract":"Based on research on currently prevalent WEB application project attributes and analysis on the influence factors on development effort of the project, an estimation methodology based on page is present, in which, when the user WEB pages DEMO developed after requirements development, project effort can be estimated by evaluating pages' complexity and corresponding team productivity which can be obtained by referring to historical data in organization measurement analysis repository. Instance shows that the method is practical and facile with a comparative high precision and is visual and helpful for project planning and controlling.","PeriodicalId":232832,"journal":{"name":"2010 International Conference on Computational Intelligence and Software Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Computational Intelligence and Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CISE.2010.5676745","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Based on research on currently prevalent WEB application project attributes and analysis on the influence factors on development effort of the project, an estimation methodology based on page is present, in which, when the user WEB pages DEMO developed after requirements development, project effort can be estimated by evaluating pages' complexity and corresponding team productivity which can be obtained by referring to historical data in organization measurement analysis repository. Instance shows that the method is practical and facile with a comparative high precision and is visual and helpful for project planning and controlling.