A fuzzy branch and bound-based transmission system expansion planning considering ambiguities

T. Tran, J.S. Choi, J. Park, S. Moon, A. El-Keib
{"title":"A fuzzy branch and bound-based transmission system expansion planning considering ambiguities","authors":"T. Tran, J.S. Choi, J. Park, S. Moon, A. El-Keib","doi":"10.1109/PES.2004.1373258","DOIUrl":null,"url":null,"abstract":"This paper proposes a new method for choice of the best transmission system expansion plan considering ambiguities power systems. The proposed method considers the permissibility and ambiguity of the investment budget (economics) for constructing the new transmission lines and the delivery marginal rate (reliability criteria) of the system by modeling the transmission expansion problem as a fuzzy integer programming one. It solves for the optimal strategy (reasonable as well as flexible) using a fuzzy set theory-based on branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Under no or only a very small database for the evaluation of reliability indices, the proposed technique provides the decision maker with a valuable and practical tool to solve the transmission expansion problem considering problem uncertainties. Test results on the 63-bus test practical size system show that the proposed method is practical and efficiently applicable to the transmission expansion planning.","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.1373258","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

This paper proposes a new method for choice of the best transmission system expansion plan considering ambiguities power systems. The proposed method considers the permissibility and ambiguity of the investment budget (economics) for constructing the new transmission lines and the delivery marginal rate (reliability criteria) of the system by modeling the transmission expansion problem as a fuzzy integer programming one. It solves for the optimal strategy (reasonable as well as flexible) using a fuzzy set theory-based on branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Under no or only a very small database for the evaluation of reliability indices, the proposed technique provides the decision maker with a valuable and practical tool to solve the transmission expansion problem considering problem uncertainties. Test results on the 63-bus test practical size system show that the proposed method is practical and efficiently applicable to the transmission expansion planning.
考虑歧义的基于模糊分支和边界的输电系统扩展规划
提出了一种考虑电力系统模糊性的输电系统最佳扩容方案选择的新方法。该方法通过将输电扩展问题建模为模糊整数规划问题,考虑了新建输电线路投资预算(经济学)的允许性和模糊性以及输电边际率(可靠性标准)。采用基于模糊集理论的分支定界法,利用网络流方法和最大流最小割集定理求解最优策略(既合理又灵活)。在没有或只有很小的可靠性指标评估数据库的情况下,该方法为决策者解决考虑问题不确定性的输电扩展问题提供了一个有价值的实用工具。在63母线试验实际尺寸系统上的试验结果表明,该方法切实可行,可有效地应用于输电扩展规划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信