{"title":"The projection of the specific practices of the third level of CMMI model in agile methods: Scrum, XP and Kanban","authors":"Z. Bougroun, A. Zeaaraoui, T. Bouchentouf","doi":"10.1109/CIST.2014.7016614","DOIUrl":null,"url":null,"abstract":"Most large companies have adopted CMMI in order to improve software quality, reduce the budget, and have customer satisfaction. But since the advent of agile methods, companies are looking to integrate these methods for software development. To adopt these methods in the project we need to know if they cover a part of CMMI. In this paper we present the CMMI model and Scrum XP and Kanban methods, than we make the mapping between these methods and CMMI level 3. The merge of the three methods covers 58% of process quality of the CMMI model level three.","PeriodicalId":106483,"journal":{"name":"2014 Third IEEE International Colloquium in Information Science and Technology (CIST)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Third IEEE International Colloquium in Information Science and Technology (CIST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIST.2014.7016614","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17
Abstract
Most large companies have adopted CMMI in order to improve software quality, reduce the budget, and have customer satisfaction. But since the advent of agile methods, companies are looking to integrate these methods for software development. To adopt these methods in the project we need to know if they cover a part of CMMI. In this paper we present the CMMI model and Scrum XP and Kanban methods, than we make the mapping between these methods and CMMI level 3. The merge of the three methods covers 58% of process quality of the CMMI model level three.