S. Kasyanov, R.K. Nabieva, A. Bekmeshov, A. Shurpo
{"title":"PLANNING OF VERIFICATION OF THE PRE-PRODUCTION PROCESS OF A NEW AUTOMOTIVE COMPONENT","authors":"S. Kasyanov, R.K. Nabieva, A. Bekmeshov, A. Shurpo","doi":"10.31145/1999-513x-2022-6-53-59","DOIUrl":null,"url":null,"abstract":"The article discusses the issues of fulfilling the list of special (especially responsible) quality characteristics of a new automotive component based on planning verification of the pre-production process. The main tool for confirming the quality of the preparation of production was the positive result of the release of the installation batch of the automotive component. Confirmation of the fulfillment of the full set of requirements is based on the development of an installation batch management plan in accordance with the IATF 16949-16 standard.The verification plan of the pre-production process must be formed without missing a single characteristic in the course of the project. Efficient management of the installation batch allows you to get production approval on the first attempt with minimal production preparation time. This greatly reduces the risks of receiving customer claims during serial deliveries.","PeriodicalId":196813,"journal":{"name":"Quality. Innovation. Education","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality. Innovation. Education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31145/1999-513x-2022-6-53-59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The article discusses the issues of fulfilling the list of special (especially responsible) quality characteristics of a new automotive component based on planning verification of the pre-production process. The main tool for confirming the quality of the preparation of production was the positive result of the release of the installation batch of the automotive component. Confirmation of the fulfillment of the full set of requirements is based on the development of an installation batch management plan in accordance with the IATF 16949-16 standard.The verification plan of the pre-production process must be formed without missing a single characteristic in the course of the project. Efficient management of the installation batch allows you to get production approval on the first attempt with minimal production preparation time. This greatly reduces the risks of receiving customer claims during serial deliveries.