On Cost Performance of Public Building Projects: Determining the Effect of Errors in Bills of Quantities in North Eastern Nigeria

A. A. Jalam, Nuru Gambo Alhassan Dahiru
{"title":"On Cost Performance of Public Building Projects: Determining the Effect of Errors in Bills of Quantities in North Eastern Nigeria","authors":"A. A. Jalam, Nuru Gambo Alhassan Dahiru","doi":"10.35370/bjssh.2019.1.1-04","DOIUrl":null,"url":null,"abstract":"Construction cost performance is one of the major criteria by which success of building projects are measured. However, numerous factors were reported by researchers to be responsible for extreme poor cost performance, among which is inaccurate cost estimate. Preceding researches focused largely on: identifying and categorizing errors in Bills of Quantities (BOQ) as a document that provides cost estimate, errors in construction contract document at large, and sustainability of the application of BOQ despite the faced challenges. It is therefore necessary to determine the level of effects of errors in BOQ as a component of contract document on cost performance of public building project in order to augment the effectiveness of cost performance in North Eastern Nigeria. Positivist research approach was used where 140 questionnaires were administered to quantity surveyors (QSs): consultants’ QSs, contractors’ QSs and public servants’ QSs whom were selected using simple random sampling technique. 112 were returned and 105 were used for the analysis with 7 invalids, this resulted to response rate of 75%. The effect of errors was measured using multiple regression analysis. The results indicated that errors in BOQ contributes to poor cost performance with statistically significant effect size of 6.8%. This research is limited to errors in BOQ in North Eastern Nigeria. It should serve as a wake-up call to stakeholders in Nigerian construction industry on the consequences of errors in BOQ for enhancing effective cost performance for national economic development.","PeriodicalId":173200,"journal":{"name":"Borneo Journal of Social Sciences and Humanities","volume":"88 43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Borneo Journal of Social Sciences and Humanities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35370/bjssh.2019.1.1-04","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction cost performance is one of the major criteria by which success of building projects are measured. However, numerous factors were reported by researchers to be responsible for extreme poor cost performance, among which is inaccurate cost estimate. Preceding researches focused largely on: identifying and categorizing errors in Bills of Quantities (BOQ) as a document that provides cost estimate, errors in construction contract document at large, and sustainability of the application of BOQ despite the faced challenges. It is therefore necessary to determine the level of effects of errors in BOQ as a component of contract document on cost performance of public building project in order to augment the effectiveness of cost performance in North Eastern Nigeria. Positivist research approach was used where 140 questionnaires were administered to quantity surveyors (QSs): consultants’ QSs, contractors’ QSs and public servants’ QSs whom were selected using simple random sampling technique. 112 were returned and 105 were used for the analysis with 7 invalids, this resulted to response rate of 75%. The effect of errors was measured using multiple regression analysis. The results indicated that errors in BOQ contributes to poor cost performance with statistically significant effect size of 6.8%. This research is limited to errors in BOQ in North Eastern Nigeria. It should serve as a wake-up call to stakeholders in Nigerian construction industry on the consequences of errors in BOQ for enhancing effective cost performance for national economic development.
对公共建筑工程造价绩效的影响:确定尼日利亚东北部工程量清单误差的影响
工程造价绩效是衡量建筑工程成功与否的主要标准之一。然而,研究人员报告了许多因素导致了极端糟糕的性价比,其中包括不准确的成本估算。以往的研究主要集中在工程量清单(BOQ)中的错误识别和分类、工程合同文件中的错误识别和分类以及BOQ在面临挑战时应用的可持续性等方面。因此,有必要确定工程量清单中的错误对公共建筑项目成本绩效的影响程度,作为合同文件的组成部分,以提高尼日利亚东北部的成本绩效效果。采用实证研究方法,采用简单随机抽样的方法,对工料测量师、顾问工料测量师、承包商工料测量师和公务员工料测量师发放了140份问卷。返回112份,105份用于分析,无效7份,有效率为75%。采用多元回归分析测量误差的影响。结果表明,工程量清单中的错误导致了较差的性价比,其统计效应值为6.8%。本研究仅限于尼日利亚东北部工程量清单中的错误。它应该为尼日利亚建筑行业的利益相关者敲响警钟,提醒他们工程量清单错误对提高国家经济发展的有效成本效益的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信