Application of 5G Technology in Orchestration of Virtual Power Plants and Demand Response

Javad Jazaeri
{"title":"Application of 5G Technology in Orchestration of Virtual Power Plants and Demand Response","authors":"Javad Jazaeri","doi":"10.1109/ISAECT53699.2021.9668601","DOIUrl":null,"url":null,"abstract":"The increasing number of distributed energy resources (DER) and the increasing penetration of intermittent renewable generation impose a significant challenge in ensuring the reliability of the electricity grid. Orchestration of virtual power plants (VPP) and demand response (DR) programs provides flexibility in the grid and improves grid reliability. The deployment of 5G will significantly improve the performance of VPP and DR by providing reliable and low-latency communication solutions. In this paper, the advantages and challenges of using 5G in the orchestration of VPP and DR are discussed. The study shows that 5G technology can address many of the current limitations in orchestration of VPP and DR programs. Furthermore, the main challenges of 5G in large scale operations of VPP and DR programs are discussed.","PeriodicalId":137636,"journal":{"name":"2021 4th International Symposium on Advanced Electrical and Communication Technologies (ISAECT)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Symposium on Advanced Electrical and Communication Technologies (ISAECT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISAECT53699.2021.9668601","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The increasing number of distributed energy resources (DER) and the increasing penetration of intermittent renewable generation impose a significant challenge in ensuring the reliability of the electricity grid. Orchestration of virtual power plants (VPP) and demand response (DR) programs provides flexibility in the grid and improves grid reliability. The deployment of 5G will significantly improve the performance of VPP and DR by providing reliable and low-latency communication solutions. In this paper, the advantages and challenges of using 5G in the orchestration of VPP and DR are discussed. The study shows that 5G technology can address many of the current limitations in orchestration of VPP and DR programs. Furthermore, the main challenges of 5G in large scale operations of VPP and DR programs are discussed.
5G技术在虚拟电厂编排和需求响应中的应用
分布式能源(DER)数量的增加和间歇性可再生能源发电的日益普及对确保电网的可靠性提出了重大挑战。虚拟电厂(VPP)和需求响应(DR)程序的编排提供了电网的灵活性并提高了电网的可靠性。5G的部署将通过提供可靠和低延迟的通信解决方案,显著提高VPP和DR的性能。本文讨论了在VPP和DR编排中使用5G的优势和挑战。研究表明,5G技术可以解决目前VPP和DR计划编排方面的许多限制。此外,还讨论了5G在VPP和DR计划的大规模运营中的主要挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信