{"title":"Experimental estimation of energy dissipation in ITER central solenoid superconductor","authors":"C. Gung, M. Takayasu, J. Minervini","doi":"10.1109/FUSION.1993.518423","DOIUrl":null,"url":null,"abstract":"This paper demonstrates a practical process for evaluating AC losses of a full-size chrome-plated Nb/sub 3/Sn cable with key parameters determined from a laboratory-scale single-wire experiment. By using wire specifications given in the engineering design phase as experimental information, this process was applied to estimate AC losses in the inner-most layer of the ITER central solenoid.","PeriodicalId":365814,"journal":{"name":"15th IEEE/NPSS Symposium. Fusion Engineering","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"15th IEEE/NPSS Symposium. Fusion Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FUSION.1993.518423","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
This paper demonstrates a practical process for evaluating AC losses of a full-size chrome-plated Nb/sub 3/Sn cable with key parameters determined from a laboratory-scale single-wire experiment. By using wire specifications given in the engineering design phase as experimental information, this process was applied to estimate AC losses in the inner-most layer of the ITER central solenoid.