{"title":"Railway Crew Scheduling Based on Step by Step Optimization and Graph Partitioning","authors":"Ryuta Kamata, R. Watanabe","doi":"10.9746/SICETR.55.92","DOIUrl":null,"url":null,"abstract":"A railway crew scheduling problem is an assignment problem of crews for a given operational schedule under the constraint on labor regulations. In this paper, we discuss an automatic railway crew scheduling method based on numerical optimization for a large-scale and complex railway route with branch lines and multiple bases. The proposed method makes the crew schedule automatically using step by step optimization based on a partial pairing, an elastic embedded set partitioning problem and a graph partitioning.","PeriodicalId":416828,"journal":{"name":"Transactions of the Society of Instrument and Control Engineers","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions of the Society of Instrument and Control Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9746/SICETR.55.92","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A railway crew scheduling problem is an assignment problem of crews for a given operational schedule under the constraint on labor regulations. In this paper, we discuss an automatic railway crew scheduling method based on numerical optimization for a large-scale and complex railway route with branch lines and multiple bases. The proposed method makes the crew schedule automatically using step by step optimization based on a partial pairing, an elastic embedded set partitioning problem and a graph partitioning.