Monitoring software risks based on integrated AHP-ANN method

J. I. Naser, H. Al-Salman
{"title":"Monitoring software risks based on integrated AHP-ANN method","authors":"J. I. Naser, H. Al-Salman","doi":"10.29304/JQCM.2019.11.1.463","DOIUrl":null,"url":null,"abstract":"Software risk management refers to systematic process for analyzing and identifying the project risks. The present paper provides a hybrid method for IT software risks identification.  Software projects possess different features which increase the project failure possibilities.  Therefore, the present work integrate the Artificial Neural network with the Analytic Hierarchy Process (AHP-ANN) in order to solve the problem of software project estimation in early stage. The questionnaire developed to find out the risk functional model and provide the proposed method with proper data. The results observe a major common risk in software projects is the insufficient knowledge based on different software project life cycle stages. Also, there are some other important factors in software projects such as lack of good estimation in project scheduling, poor definition of project requirements which cause human errors.","PeriodicalId":418998,"journal":{"name":"Journal of Al-Qadisiyah for computer science and mathematics","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Al-Qadisiyah for computer science and mathematics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29304/JQCM.2019.11.1.463","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Software risk management refers to systematic process for analyzing and identifying the project risks. The present paper provides a hybrid method for IT software risks identification.  Software projects possess different features which increase the project failure possibilities.  Therefore, the present work integrate the Artificial Neural network with the Analytic Hierarchy Process (AHP-ANN) in order to solve the problem of software project estimation in early stage. The questionnaire developed to find out the risk functional model and provide the proposed method with proper data. The results observe a major common risk in software projects is the insufficient knowledge based on different software project life cycle stages. Also, there are some other important factors in software projects such as lack of good estimation in project scheduling, poor definition of project requirements which cause human errors.
基于综合AHP-ANN方法的软件风险监测
软件风险管理是分析和识别项目风险的系统过程。本文提出了一种IT软件风险识别的混合方法。软件项目具有不同的特性,这些特性增加了项目失败的可能性。因此,本文将人工神经网络与层次分析法(AHP-ANN)相结合,以解决软件项目早期评估问题。问卷调查的目的是找出风险功能模型,为提出的方法提供适当的数据。结果表明,软件项目中一个主要的共同风险是基于软件项目不同生命周期阶段的知识不足。此外,在软件项目中还有一些其他重要的因素,如项目进度缺乏良好的估计,项目需求定义不清,导致人为错误。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信