Exploring Alternatives to the "Consultation or Consent" Paradigm

J. Searle
{"title":"Exploring Alternatives to the \"Consultation or Consent\" Paradigm","authors":"J. Searle","doi":"10.36640/mjeal.6.2.exploring","DOIUrl":null,"url":null,"abstract":"The Dakota Access Pipeline brought the question of what adequate tribal consultation requires to the forefront. Some would argue that consultation is a weak standard and that only adopting a new standard of free, prior, and informed consent can guarantee tribes greater control and respect. However, the “consultation or consent” paradigm does not take into account important sources of law that do not fit under “consultation” or “consent” and yet could be valuable in strengthening tribes’ claims in the absence of a consent standard.","PeriodicalId":401480,"journal":{"name":"Michigan Journal of Environmental & Administrative Law","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Michigan Journal of Environmental & Administrative Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36640/mjeal.6.2.exploring","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Dakota Access Pipeline brought the question of what adequate tribal consultation requires to the forefront. Some would argue that consultation is a weak standard and that only adopting a new standard of free, prior, and informed consent can guarantee tribes greater control and respect. However, the “consultation or consent” paradigm does not take into account important sources of law that do not fit under “consultation” or “consent” and yet could be valuable in strengthening tribes’ claims in the absence of a consent standard.
探索“协商或同意”范式的替代方案
达科他输油管项目将适当的部落协商要求的问题推到了风口浪头。有人会说,协商是一个软弱的标准,只有采用自由、事先和知情同意的新标准,才能保证部落得到更大的控制和尊重。然而,“协商或同意”范式没有考虑到不适合“协商”或“同意”的重要法律来源,但在没有同意标准的情况下,这些法律来源在加强部落的主张方面可能是有价值的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信