A decomposed resolution technique for the cyclic economic lot-sizing and scheduling problem

J. Hennet
{"title":"A decomposed resolution technique for the cyclic economic lot-sizing and scheduling problem","authors":"J. Hennet","doi":"10.1109/ETFA.1999.813114","DOIUrl":null,"url":null,"abstract":"A cyclic economic lot-sizing and scheduling problem (CELSP) is formulated to solve a multistage production planning problem in a job-shop. The cyclic nature of the problem is related to the a priori assumption of constant demand rates for all the end-products. Under the common cycle approach, each generic job consists of producing an associated end-product in the quantity required to meet the demand over the common cycle horizon. The paper shows that the CESLP can be solved in a decomposed way and that its solution can easily be implemented and adjusted to limited variations of demands.","PeriodicalId":119106,"journal":{"name":"1999 7th IEEE International Conference on Emerging Technologies and Factory Automation. Proceedings ETFA '99 (Cat. No.99TH8467)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-10-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1999 7th IEEE International Conference on Emerging Technologies and Factory Automation. Proceedings ETFA '99 (Cat. No.99TH8467)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETFA.1999.813114","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A cyclic economic lot-sizing and scheduling problem (CELSP) is formulated to solve a multistage production planning problem in a job-shop. The cyclic nature of the problem is related to the a priori assumption of constant demand rates for all the end-products. Under the common cycle approach, each generic job consists of producing an associated end-product in the quantity required to meet the demand over the common cycle horizon. The paper shows that the CESLP can be solved in a decomposed way and that its solution can easily be implemented and adjusted to limited variations of demands.
循环经济批量与调度问题的分解求解方法
为解决作业车间的多阶段生产计划问题,建立了循环经济的批量与调度问题。这个问题的周期性与所有最终产品的需求率恒定的先验假设有关。在共同周期方法下,每个一般作业包括生产一个相关的最终产品,其数量需要满足共同周期范围内的需求。本文表明,CESLP可以用分解的方式求解,且求解方法易于实现和调整,以适应有限的需求变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信