{"title":"A spare strategy of circuit breakers considering aging failures","authors":"F. Chen, Yi Dai, Zhouyang Ren, Wenyuan Li","doi":"10.1109/PMAPS.2016.7764111","DOIUrl":null,"url":null,"abstract":"This paper presents a spare strategy of circuit breakers (CBs) considering aging failures based on condition monitoring data. The monitoring data are used to estimate the functional ages of CBs and the aging failure rates of CBs are calculated using the functional ages. The loss-of-load damage costs caused by both repairable and aging failures of CBs are evaluated together with the investment of spares. The number and timing of spare CBs can be determined by comparing the damage cost reductions due to spares with the additional investment costs. The proposed strategy is applied to a substation located in the south China to demonstrate the effectiveness of the proposed method.","PeriodicalId":265474,"journal":{"name":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS.2016.7764111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper presents a spare strategy of circuit breakers (CBs) considering aging failures based on condition monitoring data. The monitoring data are used to estimate the functional ages of CBs and the aging failure rates of CBs are calculated using the functional ages. The loss-of-load damage costs caused by both repairable and aging failures of CBs are evaluated together with the investment of spares. The number and timing of spare CBs can be determined by comparing the damage cost reductions due to spares with the additional investment costs. The proposed strategy is applied to a substation located in the south China to demonstrate the effectiveness of the proposed method.
考虑老化故障的断路器备用策略
基于状态监测数据,提出了一种考虑老化故障的断路器备用策略。利用监测数据估计CBs的功能年龄,并利用功能年龄计算CBs的老化故障率。对可修故障和老化故障引起的断路器的失载损坏成本进行了评估,并对备件的投资进行了分析。通过比较备用cb带来的损坏成本降低与额外投资成本,可以确定备用cb的数量和时间。将该策略应用于中国南方的一个变电站,验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信