{"title":"Scatter Scheduling for Problems with Unpredictable Structures","authors":"Minyou Wu, W. Shu","doi":"10.1109/DMCC.1991.633106","DOIUrl":null,"url":null,"abstract":"An extended scatter scheduling was applied to problems with unpredictable, asynchronous struc- tures. It has been found that with this simple schedul- ing strategy, good load balance can be reached with- out incurring much runtime overhead. This scheduling algorithm has been implemented on hypercube ma- chines, and its performance is compared with other scheduling strategies.","PeriodicalId":313314,"journal":{"name":"The Sixth Distributed Memory Computing Conference, 1991. Proceedings","volume":"65 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Sixth Distributed Memory Computing Conference, 1991. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DMCC.1991.633106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
An extended scatter scheduling was applied to problems with unpredictable, asynchronous struc- tures. It has been found that with this simple schedul- ing strategy, good load balance can be reached with- out incurring much runtime overhead. This scheduling algorithm has been implemented on hypercube ma- chines, and its performance is compared with other scheduling strategies.