{"title":"Risk Management as a Dynamic and Continuous Process in the Life Cycle of a Typical Major Civil Engineering Project","authors":"Dawa Tshering","doi":"10.17102/bjrd.rub.se2.043","DOIUrl":null,"url":null,"abstract":"While many construction industries acknowledge the importance of risk management policies but hardly do they implement a defined technique in risk management. Many construction practitioners employ linear risk management process by applying risk mitigation process as and when risk occur. When project managers and practitioners ignore the application of risk management in real time projects, the implications are almost usually observed in the projects through forced variations, scope change and high uncertainties. In a complex and major civil engineering project, the risk exposure environment changes and shifts constantly due to external factors, changing objectives and other multiple dynamic variables. Quite often, initially planned risk mitigation targets do not generate intended outcome due to inadequate application of risk assessment process. For this reason, the risk and uncertainty management must be continuous, holistic and real time throughout the project life cycle from inception to completion. The ultimate goal of risk management plan is to achieve the project objectives in terms of cost, quality and time. Thus, risk management in complex and major civil engineering projects must be applied in real time, continuously and with utmost importance.","PeriodicalId":244206,"journal":{"name":"Bhutan Journal of Research and Development","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bhutan Journal of Research and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17102/bjrd.rub.se2.043","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

While many construction industries acknowledge the importance of risk management policies but hardly do they implement a defined technique in risk management. Many construction practitioners employ linear risk management process by applying risk mitigation process as and when risk occur. When project managers and practitioners ignore the application of risk management in real time projects, the implications are almost usually observed in the projects through forced variations, scope change and high uncertainties. In a complex and major civil engineering project, the risk exposure environment changes and shifts constantly due to external factors, changing objectives and other multiple dynamic variables. Quite often, initially planned risk mitigation targets do not generate intended outcome due to inadequate application of risk assessment process. For this reason, the risk and uncertainty management must be continuous, holistic and real time throughout the project life cycle from inception to completion. The ultimate goal of risk management plan is to achieve the project objectives in terms of cost, quality and time. Thus, risk management in complex and major civil engineering projects must be applied in real time, continuously and with utmost importance.
典型重大土木工程项目生命周期中动态持续过程的风险管理
虽然许多建筑行业承认风险管理政策的重要性,但他们几乎没有在风险管理中实施明确的技术。当风险发生时,许多建筑从业人员采用线性风险管理过程。当项目经理和实践者忽视风险管理在实时项目中的应用时,在项目中通过强制变化、范围变化和高度不确定性几乎通常可以观察到其影响。在复杂重大的土木工程项目中,由于外部因素、目标变化等多个动态变量的影响,风险暴露环境不断变化和转移。通常,由于风险评估过程应用不当,最初计划的风险缓解目标不能产生预期的结果。由于这个原因,风险和不确定性管理必须是连续的、全面的和实时的,贯穿于从开始到完成的整个项目生命周期。风险管理计划的最终目标是实现项目在成本、质量和时间方面的目标。因此,在复杂和重大的土木工程项目中,风险管理必须实时、持续和极其重要地应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信