Staff Scheduling Optimization in Information Technology Projects

A. B. Filho, A. Marcal, G. Costa, P. Pinheiro
{"title":"Staff Scheduling Optimization in Information Technology Projects","authors":"A. B. Filho, A. Marcal, G. Costa, P. Pinheiro","doi":"10.1109/ICSSSM.2007.4280136","DOIUrl":null,"url":null,"abstract":"In an organization that develops Information Technology projects, often exists staff scheduling demands. In most of these organizations the resources are simultaneously shared between many projects. The organization has the responsibility of doing this optimized staff scheduling attending the projects demands. But, this is not a simple task to do and it turns more complex as the number of projects and professional increases. This paper proposes a mathematical programming model supported by multicriteria that will assist the Information Technology organization during the staff scheduling activity. The proposed model aims to optimize the demands of the professionals to the Information Technology projects.","PeriodicalId":153603,"journal":{"name":"2007 International Conference on Service Systems and Service Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-06-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 International Conference on Service Systems and Service Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSSM.2007.4280136","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

In an organization that develops Information Technology projects, often exists staff scheduling demands. In most of these organizations the resources are simultaneously shared between many projects. The organization has the responsibility of doing this optimized staff scheduling attending the projects demands. But, this is not a simple task to do and it turns more complex as the number of projects and professional increases. This paper proposes a mathematical programming model supported by multicriteria that will assist the Information Technology organization during the staff scheduling activity. The proposed model aims to optimize the demands of the professionals to the Information Technology projects.
信息技术项目中的人员调度优化
在开发信息技术项目的组织中,经常存在员工调度需求。在大多数这样的组织中,资源在许多项目之间同时共享。组织有责任优化员工日程安排,以满足项目需求。但是,这不是一项简单的任务,随着项目数量和专业人员的增加,它变得更加复杂。本文提出了一个多准则支持的数学规划模型,以辅助信息技术组织在员工调度活动中的工作。该模型旨在优化专业人员对信息技术项目的需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信