{"title":"Impact on the Design Phase of Industrial Housing When Applying a Product Platform Approach","authors":"S. Thajudeen, M. Lennartsson, F. Elgh","doi":"10.24928/2018/0281","DOIUrl":null,"url":null,"abstract":"With a glulam-based post-beam building system, a variety of building solutions is offered on the market for multi-story buildings. The building system must be adaptable to the demands of each proje ...","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0281","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
With a glulam-based post-beam building system, a variety of building solutions is offered on the market for multi-story buildings. The building system must be adaptable to the demands of each proje ...