PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PROYEK FAMILIA URBAN B.EK.A.SI

Tri Rahmanto, Syapril Janizar
{"title":"PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PROYEK FAMILIA URBAN B.EK.A.SI","authors":"Tri Rahmanto, Syapril Janizar","doi":"10.51988/jtsc.v3i2.48","DOIUrl":null,"url":null,"abstract":"Project management is the process of planning, coordinating organization, and controlling resources so that objectives are achieved effectively and efficiently. This study aims to determine the performance of the project in terms of cost and time conditions with the earned value method on the Bekasi Urban Familia Housing Development Project. The method in this study uses quantitative methods, quantitative research is research on data that is numerical and tends to use analysis. The method used is by field observations, interviews with implementing contractors, and data processing from the field such as working drawings and basic unit prices. Based on the results of the study, the actual cost of the 18th week was Rp. 2,859,922,545.75, while the planned budget for that week was Rp. 3,381,087,652.62. Project performance in the form of actual progress weights issued until that week was 58.04% while in that week it was planned to be 67.98%. Estimated cost and time projections at the end of the project are obtained that the cost to complete the remaining work during that time (BETC) is IDR 897,934,488.98 and the total cost the final amount (EAC) was Rp. 4,927,465,511.02. The time to complete the project (SETC) is 151 days with a total planning time of 147 days. Due to the delay in project completion, the contractor will be fined Rp. 23,301,600 the total final cost of the project according to the work contract is Rp. Rp 4,950,767,111.02.","PeriodicalId":282558,"journal":{"name":"JURNAL TEKNIK SIPIL CENDEKIA (JTSC)","volume":"113 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL TEKNIK SIPIL CENDEKIA (JTSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51988/jtsc.v3i2.48","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Project management is the process of planning, coordinating organization, and controlling resources so that objectives are achieved effectively and efficiently. This study aims to determine the performance of the project in terms of cost and time conditions with the earned value method on the Bekasi Urban Familia Housing Development Project. The method in this study uses quantitative methods, quantitative research is research on data that is numerical and tends to use analysis. The method used is by field observations, interviews with implementing contractors, and data processing from the field such as working drawings and basic unit prices. Based on the results of the study, the actual cost of the 18th week was Rp. 2,859,922,545.75, while the planned budget for that week was Rp. 3,381,087,652.62. Project performance in the form of actual progress weights issued until that week was 58.04% while in that week it was planned to be 67.98%. Estimated cost and time projections at the end of the project are obtained that the cost to complete the remaining work during that time (BETC) is IDR 897,934,488.98 and the total cost the final amount (EAC) was Rp. 4,927,465,511.02. The time to complete the project (SETC) is 151 days with a total planning time of 147 days. Due to the delay in project completion, the contractor will be fined Rp. 23,301,600 the total final cost of the project according to the work contract is Rp. Rp 4,950,767,111.02.
通过验证价值城市家庭项目的方法控制成本和时间
项目管理是计划、协调组织和控制资源的过程,以便有效和高效地实现目标。本研究以贝卡西城市家庭住宅开发项目为研究对象,运用挣值法确定项目在成本和时间条件下的绩效。本研究的方法采用定量方法,定量研究是对数据的研究,是数值化的,倾向于使用分析。所使用的方法是实地观察,与执行承包商面谈,以及处理现场数据,如工作图纸和基本单价。根据研究结果,第18周的实际费用为2,859,922,545.75卢比,而该周的计划预算为3,381,087,652.62卢比。截止当周实际发布进度权重的项目绩效为58.04%,而当周计划为67.98%。项目结束时的估计成本和时间预测显示,在此期间完成剩余工作的成本(BETC)为897,934,488.98印尼盾,最终金额(EAC)的总成本为4,927,465,511.02印尼盾。项目完成时间(国家经贸委)为151天,总规划时间147天。由于工程的延迟完成,承包商将被罚款Rp. 23,301,600 .根据工作合同,该项目的最终总成本为Rp。Rp 4950767111 .02点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信