{"title":"Private investments profitability in the Croatian liberalized energy market","authors":"M. Ćosić, M. Puharić","doi":"10.1109/EEM.2011.5952996","DOIUrl":null,"url":null,"abstract":"Electricity deficit in Croatia requires significant investments into new production capacities in order to satisfy future rising needs. Due to, the lack of investments and more than thirty years old production power plants, investments in new production capacities are the most important prerequisite for future economic growth and development in Croatia. In order to estimate investment profitability of a new gas power plant, spark spread analysis based on historical spot prices has been done. Profitability of the independent power producer and feasibility of such market oriented investment has been analyzed. Taking into account all relevant costs the investment effectiveness of a CCGT power plant operation on a fully liberalized Croatian energy market has been estimated.","PeriodicalId":143375,"journal":{"name":"2011 8th International Conference on the European Energy Market (EEM)","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 8th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2011.5952996","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Electricity deficit in Croatia requires significant investments into new production capacities in order to satisfy future rising needs. Due to, the lack of investments and more than thirty years old production power plants, investments in new production capacities are the most important prerequisite for future economic growth and development in Croatia. In order to estimate investment profitability of a new gas power plant, spark spread analysis based on historical spot prices has been done. Profitability of the independent power producer and feasibility of such market oriented investment has been analyzed. Taking into account all relevant costs the investment effectiveness of a CCGT power plant operation on a fully liberalized Croatian energy market has been estimated.
克罗地亚自由化能源市场的私人投资盈利能力
克罗地亚的电力短缺需要对新的生产能力进行大量投资,以满足未来不断增长的需求。由于缺乏投资和已有30多年历史的生产发电厂,对新生产能力的投资是克罗地亚未来经济增长和发展的最重要先决条件。为了评估新建燃气电厂的投资盈利能力,基于历史现货价格进行了火花扩散分析。分析了独立发电企业的盈利能力和这种市场化投资的可行性。在考虑到所有有关费用的情况下,估计了在完全自由化的克罗地亚能源市场上运行一个CCGT发电厂的投资效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信