{"title":"AVALIAÇÃO PÓS-CONSTRUÇÃO DE OBRAS PÚBLICAS: CONTRATAÇÃO EM ETAPAS DE EXECUÇÃO","authors":"Vander Yamauchi, Marcos Martinez Silvoso, Ricardo Socas Wiese","doi":"10.53706/gep.v.21.6139","DOIUrl":null,"url":null,"abstract":"In Brazil, every public institution has autonomy, in compliance with current legislation, to decide the delivery method, according to its experience and team capacity, This paper proposes to evaluate multi prime contracting construction procurement based on a post-construction performance analysis for a Brazilian public university. The results suggest that buildings constructed in one stage have lower productivity and unit cost, when compared to two stage procurement. However, it was noted that the relevance of post-construction evaluation is on improving institution management processes, rather than a construction judgment instrument.","PeriodicalId":288834,"journal":{"name":"Gestão & Planejamento","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gestão & Planejamento","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53706/gep.v.21.6139","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In Brazil, every public institution has autonomy, in compliance with current legislation, to decide the delivery method, according to its experience and team capacity, This paper proposes to evaluate multi prime contracting construction procurement based on a post-construction performance analysis for a Brazilian public university. The results suggest that buildings constructed in one stage have lower productivity and unit cost, when compared to two stage procurement. However, it was noted that the relevance of post-construction evaluation is on improving institution management processes, rather than a construction judgment instrument.