Lighting and illumination committee

G. Stickney
{"title":"Lighting and illumination committee","authors":"G. Stickney","doi":"10.1109/JoAIEE.1922.6593220","DOIUrl":null,"url":null,"abstract":"The Committee herewith submits its report in two sections — first, activities of the Committee, and second, progress in the art. Activities of the Committee The Committee was appointed about the middle of October. Early in November, a “correspondence meeting” was held, by which the views of the Committee were obtained on subjects which appeared important to the Chairman. This was followed by a meeting at the Association's headquarters. At this time, the plans for the year were finally agreed upon and arrangements made for carrying them out.","PeriodicalId":268640,"journal":{"name":"Journal of the American Institute of Electrical Engineers","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1922-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the American Institute of Electrical Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JoAIEE.1922.6593220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Committee herewith submits its report in two sections — first, activities of the Committee, and second, progress in the art. Activities of the Committee The Committee was appointed about the middle of October. Early in November, a “correspondence meeting” was held, by which the views of the Committee were obtained on subjects which appeared important to the Chairman. This was followed by a meeting at the Association's headquarters. At this time, the plans for the year were finally agreed upon and arrangements made for carrying them out.
照明及照明委员会
委员会在此分两节提交其报告- -第一节,委员会的活动,第二节,该领域的进展。委员会的活动委员会大约是在10月中旬任命的。11月初举行了一次“通信会议”,会上就主席认为重要的问题征求了委员会的意见。随后在协会总部举行了一次会议。此时,终于商定了这一年的计划,并作出了执行计划的安排。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信