Investigation of the RUFRIS method with GNSS and total station for leveling

Mohammad Amin Alizadeh Khameneh, A. Jensen, M. Horemuz, J. Andersson
{"title":"Investigation of the RUFRIS method with GNSS and total station for leveling","authors":"Mohammad Amin Alizadeh Khameneh, A. Jensen, M. Horemuz, J. Andersson","doi":"10.1109/ICL-GNSS.2017.8376251","DOIUrl":null,"url":null,"abstract":"The establishment of leveling benchmarks for performing geodetic measurements, for instance in construction works, is usually costly and laborious due to a mass of field works in transferring the height from nearby known benchmarks. In this study, a real-time updated free station (RUFRIS) method is investigated to be used as an alternative approach for the traditional leveling. The coordinates of a RUFRIS station are determined by establishing a total station on the point, and performing a free-station by observing some points with both Real-Time Kinematic (RTK) GNSS and total station distance and direction observations. The study is conducted based on data from the East Link project in Sweden, where a 150 km long high-speed railway is to be constructed. The results show a standard deviation of 7 mm between the RUFRIS and leveling heights in this project and imply the feasibility of replacing the traditional leveling methods with RUFRIS in projects with low accessibility to benchmarks.","PeriodicalId":330366,"journal":{"name":"2017 International Conference on Localization and GNSS (ICL-GNSS)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Localization and GNSS (ICL-GNSS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICL-GNSS.2017.8376251","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

The establishment of leveling benchmarks for performing geodetic measurements, for instance in construction works, is usually costly and laborious due to a mass of field works in transferring the height from nearby known benchmarks. In this study, a real-time updated free station (RUFRIS) method is investigated to be used as an alternative approach for the traditional leveling. The coordinates of a RUFRIS station are determined by establishing a total station on the point, and performing a free-station by observing some points with both Real-Time Kinematic (RTK) GNSS and total station distance and direction observations. The study is conducted based on data from the East Link project in Sweden, where a 150 km long high-speed railway is to be constructed. The results show a standard deviation of 7 mm between the RUFRIS and leveling heights in this project and imply the feasibility of replacing the traditional leveling methods with RUFRIS in projects with low accessibility to benchmarks.
基于GNSS和全站仪的RUFRIS平准方法研究
为进行大地测量而建立水准基准,例如在建筑工程中,通常是昂贵和费力的,因为需要大量的实地工作从附近已知的基准转移高度。本文研究了一种实时更新自由站(RUFRIS)方法,以作为传统水准测量的替代方法。RUFRIS站的坐标是通过在点上建立一个全站仪来确定的,并通过实时动态GNSS (RTK)和全站仪的距离和方向观测来对一些点进行自由站观测。这项研究是根据瑞典东线项目的数据进行的,该项目将建设一条150公里长的高速铁路。结果表明,该项目的RUFRIS与水准高度之间的标准差为7 mm,表明在基准可及性较低的项目中,用RUFRIS替代传统水准方法是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信