​Asset optimization of baranangsiang terminal commercial area using highest and best use analysis: a case study of Bogor city government’s asset

D. Rahmadanti, Y. Azis, R. Komara
{"title":"​Asset optimization of baranangsiang terminal commercial area using highest and best use analysis: a case study of Bogor city government’s asset","authors":"D. Rahmadanti, Y. Azis, R. Komara","doi":"10.18801/IJBMSR.050219.35","DOIUrl":null,"url":null,"abstract":"The main problem in Bogor city government’s financial report is non-compliance against the provisions of the asset management legislation. The idle assets will only become a burden for government if it’s not optimized, because it needs maintenance costs. Those assets have potential to be optimize in order to give revenue to government. This study aims to determine the best option of Bogor city government’s asset in the form of land in baranangsiang terminal area using Highest and Best Use (HBU) Analysis. The result of this research shows that the best alternative to be built in baranangsiang terminal commercial area is shopping center.","PeriodicalId":273286,"journal":{"name":"International Journal of Business Management and Social Research","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Business Management and Social Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18801/IJBMSR.050219.35","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The main problem in Bogor city government’s financial report is non-compliance against the provisions of the asset management legislation. The idle assets will only become a burden for government if it’s not optimized, because it needs maintenance costs. Those assets have potential to be optimize in order to give revenue to government. This study aims to determine the best option of Bogor city government’s asset in the form of land in baranangsiang terminal area using Highest and Best Use (HBU) Analysis. The result of this research shows that the best alternative to be built in baranangsiang terminal commercial area is shopping center.
基于最高和最佳利用分析的巴兰南翔码头商业区资产优化——以茂物市政府资产为例
茂物市政府财务报告存在的主要问题是不符合资产管理立法的规定。闲置资产如果不进行优化只会成为政府的负担,因为它需要维护成本。为了给政府带来收入,这些资产有潜力得到优化。本研究旨在运用最高与最佳利用(HBU)分析法,确定茂物市政府资产在baranangsiang终端区域土地形式的最佳选择。研究结果显示,在八郎巷码头商业区兴建购物中心是最佳选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信