Two-Component Assessment of Projects with Attraction of Expert Data

V. Gusev
{"title":"Two-Component Assessment of Projects with Attraction of Expert Data","authors":"V. Gusev","doi":"10.1109/MLSD.2018.8551906","DOIUrl":null,"url":null,"abstract":"Procedures of calculation of estimates of full costs of material and temporary resources when functioning complicated systems at a stage of their design are considered. When receiving estimates of influence set of a factor cost of material and temporary resources which estimates can be set as an expert way, and on the basis of the analysis of objective information is considered. Full costs are estimated by means of transitive closures of direct unit cost which is carried out by the reflexive procedures using partially linear operations overestimates. The analysis of projects on the basis of estimates of costs comes to an end with the procedure of verification of the scheme of estimation.","PeriodicalId":158352,"journal":{"name":"2018 Eleventh International Conference \"Management of large-scale system development\" (MLSD","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 Eleventh International Conference \"Management of large-scale system development\" (MLSD","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MLSD.2018.8551906","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Procedures of calculation of estimates of full costs of material and temporary resources when functioning complicated systems at a stage of their design are considered. When receiving estimates of influence set of a factor cost of material and temporary resources which estimates can be set as an expert way, and on the basis of the analysis of objective information is considered. Full costs are estimated by means of transitive closures of direct unit cost which is carried out by the reflexive procedures using partially linear operations overestimates. The analysis of projects on the basis of estimates of costs comes to an end with the procedure of verification of the scheme of estimation.
吸引专家数据的项目双分量评估
考虑在复杂系统的设计阶段运行时,计算材料和临时资源的全部成本的估计程序。当收到影响集某一因素的材料成本和临时资源成本的估计时,可以将其作为一种专家方法进行设置,并在客观信息分析的基础上加以考虑。全部成本是通过直接单位成本的传递闭包来估计的,直接单位成本是通过使用部分线性操作高估的反射过程来实现的。以成本估算为基础的项目分析,随着估算方案的验证程序而结束。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信