{"title":"Distributed architecture for production planning and control in discrete manufacturing","authors":"A. Villa","doi":"10.1109/CIM.1988.5430","DOIUrl":null,"url":null,"abstract":"The production management (PM) problems to be solved in a discrete manufacturing plant of large dimension are analyzed. Two separated approaches are discussed: the plant manager approach and the systems integrator approach. In the former, one states the PM objectives to be optimized; using the latter, one must suggest the mathematical formalizations of PM problems and the methods to solve them. A hierarchical decentralized architecture is outlined in which methods of integrating decision modules implementing PM problem-solution strategies are suggested. The practical problems concerning the total integration are presented.<<ETX>>","PeriodicalId":334994,"journal":{"name":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIM.1988.5430","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The production management (PM) problems to be solved in a discrete manufacturing plant of large dimension are analyzed. Two separated approaches are discussed: the plant manager approach and the systems integrator approach. In the former, one states the PM objectives to be optimized; using the latter, one must suggest the mathematical formalizations of PM problems and the methods to solve them. A hierarchical decentralized architecture is outlined in which methods of integrating decision modules implementing PM problem-solution strategies are suggested. The practical problems concerning the total integration are presented.<>