{"title":"Oosterweel – from an underground and even underwater road infrastructure plan to an urban transformation project","authors":"Luc Hellemans","doi":"10.2749/ghent.2021.0035","DOIUrl":null,"url":null,"abstract":"For the coming ten years, the heart of Europe will turn into a gigantic construction site for works on one of the largest hubs of the continent: Antwerp. The Oosterweel Link is the project whereby the motorway ring around Antwerp is undergoing a metamorphosis to reinvigorate traffic flow and add living space to the City. The project had come to a standstill for several years as a result of protests by assertive citizens, but was given a second lease of life following a large-scale participation project.To ensure its successful completion, unparalleled efforts are being made in the field and in the area of digitization. It is therefore with good reason that in Belgium the project is referred to as “the construction site of the century”.","PeriodicalId":162435,"journal":{"name":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/ghent.2021.0035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
For the coming ten years, the heart of Europe will turn into a gigantic construction site for works on one of the largest hubs of the continent: Antwerp. The Oosterweel Link is the project whereby the motorway ring around Antwerp is undergoing a metamorphosis to reinvigorate traffic flow and add living space to the City. The project had come to a standstill for several years as a result of protests by assertive citizens, but was given a second lease of life following a large-scale participation project.To ensure its successful completion, unparalleled efforts are being made in the field and in the area of digitization. It is therefore with good reason that in Belgium the project is referred to as “the construction site of the century”.