Managing collaborative activities in project management

Shaoke Zhang, Chen Zhao, Qiang Zhang, Hui Su, Haiyan Guo, Jie Cui, Yingxin Pan, P. Moody
{"title":"Managing collaborative activities in project management","authors":"Shaoke Zhang, Chen Zhao, Qiang Zhang, Hui Su, Haiyan Guo, Jie Cui, Yingxin Pan, P. Moody","doi":"10.1145/1234772.1234791","DOIUrl":null,"url":null,"abstract":"People working with current ad-hoc collaboration tools suffer from information overload and information scattered. Our five-month study of project managers found their work was comprised of fragmented activities implicitly organized by activity threads. Most of these activities were communicative to track and report project status, which introduced frequent interruptions and low efficiency. Accordingly, we explored an activity centered approach to help them manage work information. In our Activity Centric Project Management prototype, solutions like integrating activity with project task, providing timely activity awareness based on RSS, utilizing activity data to generate status report, and allowing third-party easily to update task status were introduced.","PeriodicalId":157379,"journal":{"name":"Computer Human Interaction for Management of Information Technology","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computer Human Interaction for Management of Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1234772.1234791","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

People working with current ad-hoc collaboration tools suffer from information overload and information scattered. Our five-month study of project managers found their work was comprised of fragmented activities implicitly organized by activity threads. Most of these activities were communicative to track and report project status, which introduced frequent interruptions and low efficiency. Accordingly, we explored an activity centered approach to help them manage work information. In our Activity Centric Project Management prototype, solutions like integrating activity with project task, providing timely activity awareness based on RSS, utilizing activity data to generate status report, and allowing third-party easily to update task status were introduced.
管理项目管理中的协作活动
使用当前特别协作工具的人们遭受信息过载和信息分散的困扰。我们对项目经理进行了为期5个月的研究,发现他们的工作是由由活动线程隐式组织的分散活动组成的。大多数这些活动都是交流的,以跟踪和报告项目状态,这导致了频繁的中断和低效率。因此,我们探索了一种以活动为中心的方法来帮助他们管理工作信息。在我们的以活动为中心的项目管理原型中,引入了诸如将活动与项目任务集成、基于RSS提供及时的活动感知、利用活动数据生成状态报告以及允许第三方轻松更新任务状态等解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信