{"title":"MANAGEMENT OF VARIATIONS WITH THE USE OF STANDARD FORMS OF CONTRACT IN PUBLIC SECTOR BUILDING PROJECTS IN SRI LANKA","authors":"A. Senadeera, D. Sirimewan, B. Perera","doi":"10.31705/faru.2020.25","DOIUrl":null,"url":null,"abstract":"In most of the public construction projects in developing countries, a large number of ‘variations’ that result from the changes made to the original scopes of the projects urge the need of variation management by the parties to a contract. This study explores the ways of managing variations in public sector building projects executed in Sri Lanka with the use of Standard Forms of Contract. It applied a qualitative research approach and used a comprehensive literature review expert interviews for data collection. Manual content analysis was used to analyse the collected data. The findings reveal numerous causes of variations for which the Employer, Consultant, Contractor, or certain other factors are responsible. The research also reveals that the variations could be minimised by adopting strategies, such as the preparation of a fully detailed Employer’s brief, review of the design and deployment of qualified personnel. The study proposes to modify the variation clause by adding more explanations in the Standard Form of Contract to facilitate effective variation management in Sri Lanka.","PeriodicalId":302507,"journal":{"name":"Conference Proceedings - FARU 2020","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Proceedings - FARU 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/faru.2020.25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In most of the public construction projects in developing countries, a large number of ‘variations’ that result from the changes made to the original scopes of the projects urge the need of variation management by the parties to a contract. This study explores the ways of managing variations in public sector building projects executed in Sri Lanka with the use of Standard Forms of Contract. It applied a qualitative research approach and used a comprehensive literature review expert interviews for data collection. Manual content analysis was used to analyse the collected data. The findings reveal numerous causes of variations for which the Employer, Consultant, Contractor, or certain other factors are responsible. The research also reveals that the variations could be minimised by adopting strategies, such as the preparation of a fully detailed Employer’s brief, review of the design and deployment of qualified personnel. The study proposes to modify the variation clause by adding more explanations in the Standard Form of Contract to facilitate effective variation management in Sri Lanka.
斯里兰卡公共部门建筑项目中使用标准合同形式的变化管理
在发展中国家的大多数公共建设项目中,由于对项目原有范围的改变而产生的大量“变化”促使合同各方需要进行变化管理。本研究探讨了在斯里兰卡使用标准合同形式执行的公共部门建筑项目管理变化的方法。它采用了定性研究方法,并使用了全面的文献综述专家访谈的数据收集。采用人工内容分析对收集到的数据进行分析。调查结果揭示了雇主、顾问、承包商或某些其他因素造成变化的许多原因。研究还表明,可以通过采取策略将差异降到最低,例如准备一份详细的雇主简介,审查设计和部署合格人员。本研究建议修改变更条款,在标准合同形式中增加更多的解释,以促进斯里兰卡有效的变更管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信