{"title":"PENGARUH OPERASIONAL PLTD PADA BANDAR UDARA SYAMSUDIN NOOR BANJARBARU AKIBAT PEMUTUSAN TENAGA LISTRIK OLEH PT. PLN DITINJAU DARI SEGI EKONOMI","authors":"Syarifil Anwar, Ahmadil Amin","doi":"10.31602/AJST.V4I2.2041","DOIUrl":null,"url":null,"abstract":"With the growing age and increasingly sophisticated technology, it will automatically bring changes in human life. Which will also be more and more demands and needs that must be met by humans to balance these developments. One of them is human needs for electrical energy. To meet the increasing electricity needs and to prevent total power outages from occurring, Syamsudin Noor Banjarbaru Airport uses PLTD (Diesel Power Plant) as a power supply for the operation of Syamsudin Noor Airport. Payment of electricity bills at the Syamsudin Noor airport will increase by operating the PLTD at the time of termination of electricity by PT. (PLN). Every month the electricity account must be paid by Syamsudin Noor Airport, but if there is a power cut, the PLTD will operate, so that it will cause additional costs every month at Syamsudin Noor Airport. Additional fees at Syamsudin Noor Banjarbaru Airport in addition to paying electricity bills every month, plus the total operational cost of PLTD (diesel engine) of Rp.15,215,370 Keywords: PLTD (diesel engine), AC generator, total operational cost of PLTD (diesel engine).","PeriodicalId":127601,"journal":{"name":"AL ULUM: JURNAL SAINS DAN TEKNOLOGI","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AL ULUM: JURNAL SAINS DAN TEKNOLOGI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31602/AJST.V4I2.2041","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
With the growing age and increasingly sophisticated technology, it will automatically bring changes in human life. Which will also be more and more demands and needs that must be met by humans to balance these developments. One of them is human needs for electrical energy. To meet the increasing electricity needs and to prevent total power outages from occurring, Syamsudin Noor Banjarbaru Airport uses PLTD (Diesel Power Plant) as a power supply for the operation of Syamsudin Noor Airport. Payment of electricity bills at the Syamsudin Noor airport will increase by operating the PLTD at the time of termination of electricity by PT. (PLN). Every month the electricity account must be paid by Syamsudin Noor Airport, but if there is a power cut, the PLTD will operate, so that it will cause additional costs every month at Syamsudin Noor Airport. Additional fees at Syamsudin Noor Banjarbaru Airport in addition to paying electricity bills every month, plus the total operational cost of PLTD (diesel engine) of Rp.15,215,370 Keywords: PLTD (diesel engine), AC generator, total operational cost of PLTD (diesel engine).
随着年龄的增长和技术的日益成熟,它将自动给人类的生活带来变化。这也将是越来越多的需求和需要,人类必须满足,以平衡这些发展。其中之一是人类对电能的需求。为了满足日益增长的电力需求并防止发生全面停电,Syamsudin Noor Banjarbaru机场使用PLTD(柴油发电厂)作为Syamsudin Noor机场运营的电源。Syamsudin Noor机场的电费支付将通过在PT. (PLN)终止供电时运营PLTD而增加。每个月的电费必须由Syamsudin Noor机场支付,但如果停电,PLTD将运行,因此它将在Syamsudin Noor机场每月产生额外费用。Syamsudin Noor Banjarbaru机场除了每月支付电费之外的额外费用,加上PLTD(柴油发动机)的总运营成本为15,215,370卢比。关键词:PLTD(柴油发动机),交流发电机,PLTD(柴油发动机)的总运营成本。