An Exploratory Investigation of the Antecedents of the IT Project Management Capability

Lorraine S. Lee, Rita M. Anderson
{"title":"An Exploratory Investigation of the Antecedents of the IT Project Management Capability","authors":"Lorraine S. Lee, Rita M. Anderson","doi":"10.2979/ESJ.2006.5.1.27","DOIUrl":null,"url":null,"abstract":"In this study, we deploy a rank-order Delphi survey of factors impacting the information technology (IT) project management capability. We first develop a conceptual model based on the theory of dynamic capabilities that positions IT project management as a dynamic capability enabling the IT capabilities of an organization. In our conceptual model, the IT project management maturity level is identified as one antecedent factor that influences the IT project management capability. The objective of this Delphi study is to identify additional factors beyond the scope of most project management maturity models that influence the IT project management capability. The results of this study provide the foundation for future testing and validation of the conceptual model.","PeriodicalId":133558,"journal":{"name":"e-Service Journal","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"36","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"e-Service Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2979/ESJ.2006.5.1.27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 36

Abstract

In this study, we deploy a rank-order Delphi survey of factors impacting the information technology (IT) project management capability. We first develop a conceptual model based on the theory of dynamic capabilities that positions IT project management as a dynamic capability enabling the IT capabilities of an organization. In our conceptual model, the IT project management maturity level is identified as one antecedent factor that influences the IT project management capability. The objective of this Delphi study is to identify additional factors beyond the scope of most project management maturity models that influence the IT project management capability. The results of this study provide the foundation for future testing and validation of the conceptual model.
IT项目管理能力前因的探索性研究
在本研究中,我们对影响信息技术(IT)项目管理能力的因素进行了秩序德尔菲调查。我们首先开发了一个基于动态能力理论的概念模型,该理论将IT项目管理定位为使组织的IT能力成为可能的动态能力。在我们的概念模型中,IT项目管理成熟度级别被确定为影响IT项目管理能力的一个先行因素。这个德尔菲研究的目标是识别超出大多数影响IT项目管理能力的项目管理成熟度模型范围的其他因素。本研究结果为该概念模型的进一步测试和验证奠定了基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信