A dynamic programming algorithm for optimizing the financial return of software projects

D. Tselios, P. Ipsilandis, V. Gerogiannis
{"title":"A dynamic programming algorithm for optimizing the financial return of software projects","authors":"D. Tselios, P. Ipsilandis, V. Gerogiannis","doi":"10.1109/IISA.2015.7388067","DOIUrl":null,"url":null,"abstract":"The Incremental Funding Method (IFM) in software development projects aims at optimizing the financial return of a software project through proper sequencing of development activities and incremental releases of the software product. This paper presents a Dynamic Programming (DP) project scheduling algorithm that maximizes a software project's net present value (NPV) under IFM assumptions. Through an exemplar case study we demonstrate that the DP algorithm guarantees optimality in the project scheduling sequence and offers flexibility in adjusting the optimum project schedule dynamically, as market or development conditions change.","PeriodicalId":433872,"journal":{"name":"2015 6th International Conference on Information, Intelligence, Systems and Applications (IISA)","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 6th International Conference on Information, Intelligence, Systems and Applications (IISA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IISA.2015.7388067","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Incremental Funding Method (IFM) in software development projects aims at optimizing the financial return of a software project through proper sequencing of development activities and incremental releases of the software product. This paper presents a Dynamic Programming (DP) project scheduling algorithm that maximizes a software project's net present value (NPV) under IFM assumptions. Through an exemplar case study we demonstrate that the DP algorithm guarantees optimality in the project scheduling sequence and offers flexibility in adjusting the optimum project schedule dynamically, as market or development conditions change.
软件项目财务回报优化的动态规划算法
软件开发项目中的增量资助方法(IFM)旨在通过适当的开发活动排序和软件产品的增量发布来优化软件项目的财务回报。本文提出了一种动态规划(DP)项目调度算法,该算法在IFM假设下使软件项目的净现值(NPV)最大化。通过一个典型案例研究,我们证明了DP算法保证了项目进度序列的最优性,并提供了随着市场或开发条件的变化动态调整最优项目进度的灵活性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信