{"title":"Consideration of wind parks operation in the optimal power flow problem","authors":"G. Contaxis, Andreas Vlachos","doi":"10.1109/PTC.1999.826494","DOIUrl":null,"url":null,"abstract":"In this paper, a modification to the optimal power flow problem, which accounts for the presence of wind parks and independent power producers (IPP) operation under large-scale integration of dispatchable wind energy resource in the power system, is described. A successive linear programming approach is utilized for the solution of the problem.","PeriodicalId":101688,"journal":{"name":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.1999.826494","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
In this paper, a modification to the optimal power flow problem, which accounts for the presence of wind parks and independent power producers (IPP) operation under large-scale integration of dispatchable wind energy resource in the power system, is described. A successive linear programming approach is utilized for the solution of the problem.